
Protec pioneers "dry air" mothball procedures for generating facilities, saving utilities millions in "up front" costs and reactivation costs. Protec advances establish new industry standards for utility lay ups.
|
 |
 |
|
|
 |

The MARAD ships laid up since 1986 with Protec's dehumidification /cocoon systems are reactivated both faster and at lower cost than projected. Protec's proven results lead to the award of a single source $8 million contract in 1994.
|
 |
 |
|
|
 |

Protec develops and installs the first Integrated Environmental Control System (IECS) designed to meet MSC's preposition cargo control requirements.
|
 |
 |
|
|
|
 |
|
|