Click to return to home page
Ph: 800-477-6832
E-mail Protec
Applications
Advanced tech
Case studies
Integrated solutions
Key people
Careers
20 years experience in corrosion protection
1997 Idle Equipment Protection
Construction of a new Malaysian power plant is delayed due to the Asian economic crisis. We are called upon to protect valuable utility components which are diverted to the port of Montreal and off loaded. Protec converts pier warehousing into dry storage for an indefinite time.
Converted pier into dry storage
1997 Temporary Cargo Protection
Protec temporarily installs IECS unit on an Fednav International Ship to protect steel cargo from corrosion during transit.
Cargo protected during transit
1998 Temporary Warehousing
Protec constructs a 55,000 sq. ft. tension fabric warehouse at the Port of Georgia.
Temporary warehouse
1999 LCAC Mothball System
Protec installs tension fabric building to protect LCAC at Camp Pendelton. The building environment is controlled to 35% RH to prevent corrosion and monitored by an off-site "Cargo Watch" system
LCAC protected at Camp Pendelton